دانلود رایگان مقاله مدل برای تعیین طول عمر پروژه و دوره تضمین پروژه BOT

عنوان فارسی
یک مدل برای تعیین طول عمر پروژه و دوره تضمین پروژه های BOT
عنوان انگلیسی
A model for determining the optimal project life span and concession period of BOT projects
صفحات مقاله فارسی
0
صفحات مقاله انگلیسی
10
سال انتشار
2016
نشریه
الزویر - Elsevier
فرمت مقاله انگلیسی
PDF
کد محصول
E4788
رشته های مرتبط با این مقاله
مدیریت
گرایش های مرتبط با این مقاله
مدیریت پروژه
مجله
مجله بین المللی مدیریت پروژه - International Journal of Project Management
دانشگاه
گروه سیاست عمومی، دانشگاه شهر هنگ کنگ
کلمات کلیدی
مديريت پروژه؛ انتقال ساخت و ساز؛ طول عمر پروژه؛ دوره تعهد؛ بهينه سازی
چکیده

Abstract


The concession agreement is the core feature of BOT projects, with the concession period being the most essential feature in determining the time span of the various rights, obligations and responsibilities of the government and concessionaire. Concession period design is therefore crucial for financial viability and determining the benefit/cost allocation between the host government and the concessionaire. However, while the concession period and project life span are essentially interdependent, most methods to date consider their determination as contiguous events that are determined exogenously. Moreover, these methods seldom consider the, often uncertain, social benefits and costs involved that are critical in defining, pricing and distributing benefits and costs between the various parties and evaluating potentially distributable cash flows. In this paper, we present the results of the first stage of a research project aimed at determining the optimal build-operate-transfer (BOT) project life span and concession period endogenously and interdependently by maximizing the combined benefits of stakeholders. Based on the estimation of the economic and social development involved, a negotiation space of the concession period interval is obtained, with its lower boundary creating the desired financial return for the private investors and its upper boundary ensuring the economic feasibility of the host government as well as the maximized welfare within the project life. The outcome of the new quantitative model is considered as a suitable basis for future field trials prior to implementation. The structure and details of the model are provided in the paper with Hong Kong tunnel project as a case study to demonstrate its detailed application. The basic contributions of the paper to the theory of construction procurement are that the project life span and concession period are determined jointly and the social benefits taken into account in the examination of project financial benefits. In practical terms, the model goes beyond the current practice of linear-process thinking and should enable engineering consultants to provide project information more rationally and accurately to BOT project bidders and increase the government's prospects of successfully entering into a contract with a concessionaire. This is expected to generate more negotiation space for the government and concessionaire in determining the major socioeconomic features of individual BOT contracts when negotiating the concession period. As a result, the use of the model should increase the total benefit to both parties. © 2016 Elsevier Ltd. APM and IPMA. All rights reserved.

نتیجه گیری

5. Conclusions and limitations


Most research to date assumes the project life span and cash flows are pre-given, and the concession period of BOT projects is determined exogenously by policy. The model presented in this provides a more scientific approach to improve the accuracy, efficiency and effectiveness of concession period design by simultaneously determining both the BOT concession period interval and project life span prior to soliciting bids from potential concessionaires, by maximizing the combined benefits of stakeholders while guaranteeing an attractive return for the concessionaire. In addition to the economic benefits involved, the concept of net social benefits is incorporated into the quantification of the government's total benefit. This is echoed with calls from academia and industry to integrate social benefits into Value for Money analysis framework.


بدون دیدگاه