Conclusion
In this paper, the 4P concept was validated through literature review for the identification, categorization, and analysis of delay sources in the internal construction project environment. First, the review indicated that the body of literature related delays assessment lacks cohesion and integrated focus, and the need to systematically assess, locate and develop comprehensive delay assessment framework within the internal project environment is not adequately addressed. To validate the concept, the study identified the sources of the delays and then further identified the individual risks associated with the sources. First, data from medium to large projects was gathered from peer-reviewed journals, conferences, books and other databases within the civil engineering, construction management, project management, technology management, architectural management, built environment, etc. To ensure the comprehensiveness of the concept, this study examined the references made by the authors to determine if those articles have relevant contributions or impacts. Finally, the study identified the sources of the delays and then further identified the individual risks associated with the sources. The risks or delay factors were then categorized under main sources based on shared characteristics.