ترجمه مقاله نقش ضروری ارتباطات 6G با چشم انداز صنعت 4.0
- مبلغ: ۸۶,۰۰۰ تومان
ترجمه مقاله پایداری توسعه شهری، تعدیل ساختار صنعتی و کارایی کاربری زمین
- مبلغ: ۹۱,۰۰۰ تومان
The Economic Dispatch problem consists of minimizing the cost of producing the power demanded by an electrical power system, by means of the suitable dispatching of the power production between the available generators. The difficulty in predicting wind power generation means that penalty and reserve costs must be considered when it is included in the evaluation. Analyzing the output power of each wind turbine individually is not enough when evaluating these costs and the correlation between wind speed values must be considered as another input because it also has an influence. This paper introduces a new method for generating correlated wind power values and explains how to apply the method when evaluating Economic Dispatch. A case study is provided to analyze whether considering correlation in the problem has any influence or not.
مسئله پخش بار اقتصادی شامل به حداقل رساندن هزینه تولید توان مورد نیاز توسط سیستمهای توان الکتریکی با استفاده از پخش مناسب توان بین ژنراتورهای موجود است. مشکلات موجود در پیش بینی تولید برق باد به این معنی است که جریمهها و هزینههای ذخیره شده باید در ارزیابیها گنجانده شوند. وقتی که ارزیابی این هزینهها و ارتباط بین مقادیر سرعت باد با عنوان ورودی دیگر درنظر گرفته شوند، دیگر تجزیه و تحلیل توان خروجی هر توربین باد جداگانه کافی نیست چون آنها هم یک نفوذ جداگانه دارند، این مقاله یک روش جدید برای تولید توان باد همبسته ارائه میکند و توضیح میدهد که چطور در زمان ارزیابی پخش بار این روش اعمال میشود. یک حالت مطالعه برای آنالیز این ارائه شده که آیا ارتباطات و همبستگی در مسئله تاثیری دارد یا نه؟