Abstract
Purpose of the study: This write up aims at exploring the causality between the timing of cash flows and contravention of Net Present Value and Internal Rate of Return as regards capital budgeting decision. Background of the study: It is neither too often found that Net Present Value and Internal Rate of Return are leading to neither contradiction nor have the topic been given much thrust. The endeavour is to bring this burning issue in light with the help of a practical case in an oil refinery factory. Methodology: Discounting technique has been used in the formulae to compute Net Present Value and Internal Rate of Return. Results: The study shows possibility of contravening results in case of mutually exclusive projects. Findings: It is found that due to severity of discounting factor, timing of cash flows of projects lead to contradicting results as depicted by Net Present Value and Internal Rate of Return.
نمونه چکیده ترجمه متن فارسی
چکیده
هدف مطالعه: این مقاله با هدف کاوش در علیت بین زمانبندی جریانهای نقدی و تناقض "ارزش فعلی خالص" (NPV) و "نرخ بازده داخلی" (IRR) مربوط به تصمیمگیری بودجه بندی سرمایه، نگاشته شده است. پس زمینه این مطالعه: نه خیلی به این پرداخته شده که ارزش فعلی خالص و نرخ بازده داخلی با هم در تناقضند و نه این موضوع قابل اطمینانی بوده است. سعی بر این است که به این مشکل با آوردن یک مورد عملی در یک کارخانه تصفیه نفت پرداخته شود. روش شناسی: برای محاسبه ارزش فعلی خالص و نرخ بازده داخلی از شکل فرمولی روش تنزیلی (Discounting technique) استفاده شده است. نتایج: در مورد پروژههای با انحصار متقابل امکان نمایش نتایج متناقض وجود دارد. یافتهها: یافته شده است که به دلیل شدت فاکتور تنزیلی، زمانبندی جریان های نقدی پروژه ها منجر به ظهور نتایج متناقضِ توصیف شده با ارزش فعلی خالص و نرخ بازده داخلی میشود.